Maximum Drawdown Calculator

$
$

Calculate the maximum drawdown of an investment.

Formula

MDD = (Trough − Peak) / Peak × 100%; Recovery needed = (1/(1+MDD%) − 1) × 100%
  • MDD = (Trough − Peak) / Peak × 100%; Recovery needed = (1/(1+MDD%) − 1) × 100% — for reference only.

Maximum Drawdown Calculator

Maximum Drawdown Calculator calculation.

Frequently asked questions

How is Maximum Drawdown Calculator calculated?
MDD = (Trough − Peak) / Peak × 100%; Recovery needed = (1/(1+MDD%) − 1) × 100%